"

dafa888经典版手机登录拥有全球最顶尖的原生APP,每天为您提供千场精彩体育赛事,dafa888经典版手机登录更有真人、彩票、电子老虎机、真人电子竞技游戏等多种娱乐方式选择,dafa888经典版手机登录让您尽享娱乐、赛事投注等,且无后顾之忧!

<small id="tjbtv"><delect id="tjbtv"></delect></small><label id="tjbtv"><sup id="tjbtv"><span id="tjbtv"></span></sup></label>
    <span id="tjbtv"><video id="tjbtv"></video></span><small id="tjbtv"><dfn id="tjbtv"><s id="tjbtv"></s></dfn></small>

      " Shandong Water Conservancy Construction Group Co.,Ltd
      Chinese
      English
      Contact Us  
      Tel+86 0537-2270579
      Fax+86 0537-2270579
      E-mailsdwpieco@126.com
      News
       

      Shuifa construction group co., LTD. hold the operation and production analysis and dispatching meeting from January to September 2019

                                                                                                   2019-10-10


      On the morning of October 9, the Secretary of the Party Committee and the Chairman of SDWP, accompanied by Yang Qingyun, the General Manager of the International Company, conducted a "Don't forget the first heart, keep in mind the mission" survey to the Project Department of the Gandharbpur Intake project Department of Bangladesh to understand the progress of the project construction and visit the employees of the project construction.

      The water intake project of the Gandharbpur water plant constructed by the international company is the first European standard project of SDWP, the construction difficulty is large, the safety risk is high, and the construction period of the project is short. Since the project has been on in April 2019, it has overcome many challenges such as multiple typhoon, large water level fluctuation and high construction standard, and carried out all kinds of work in an orderly manner, and the current work is stable and orderly, and the overall control is overall.

      Chairman Jia Baoli inspected the construction situation of the project site mixing station foundation backfill, temporary wharf concrete pouring, water intake blow filling and other projects, listened in detail work report and the next step, gave the full affirmation to the project department work since entering the field. He pointed out that the project department should give full play to the fine tradition of water construction, make further efforts to further enhance the "satisfaction" of the owners, and further strengthen the Bangladesh market with good reputation.

      The project department said that it will continue to carry forward the fine tradition of water construction, lead all the staff of the project department, strictly in accordance with the requirements of SDWP, strengthen project management in an all-round way, ensure safety, quality, civilized construction, establish a good reputation for the company, create more benefits for the company, and help Belt and Road Initiative develop and build.


            ӡ | P]

      Link

      Copyright  Shandong Water Conservancy Construction Group Co.,Ltd
      AddNo. Ten East Road, 33399 Shuifa tower, Ji'nan (The intersection of ten East Road and Tang Ye Xi Road)    Tel:+86 0531 80876106    E-mail:sdwpieco@126.com
      dafa888ֻ¼ <small id="tjbtv"><delect id="tjbtv"></delect></small><label id="tjbtv"><sup id="tjbtv"><span id="tjbtv"></span></sup></label>
      <span id="tjbtv"><video id="tjbtv"></video></span><small id="tjbtv"><dfn id="tjbtv"><s id="tjbtv"></s></dfn></small>

        <֩>| <֩>| <֩>| <֩>| <֩>| <֩>| <֩>| <֩>| <֩>| <֩>| <֩>| <֩>| <֩>| <֩>| <֩>| <֩>| <֩>| <֩>| <֩>| <֩>| <֩>| <֩>| <֩>| <֩>| <֩>| <֩>| <֩>| <֩>| <֩>| <֩>| <֩>| <֩>| <֩>| <֩>| <֩>| <֩>| <֩>| <֩>| <֩>| <֩>| <֩>| <ı> <ı> <ı> <ı> <ı> <ı>